Buy drip panMaybe buy another fuel jug (Adam is on it)Safety wire snap on harness ends (This weekend)Remove airbag, replace steering wheel (Work in process)Get and install numbers (Shane is on it)Tape lights (This weekend)- Gather up and organize documentation
Mount transponder (This weekend)Firewall (This weekend)Weld up spots on the floor (This weekend) - half done- Cool shirt setup (Need to talk to the team)
- Torque head bolts
- Buy spare brake
pads/shoes - Radio Setup
Buy Car Harness (Nick is on it)- Make Helmet Harnesses (Nick is on it)
Thursday, May 24, 2018
The final stretch
Monday, May 21, 2018
Debut Trackday
Poised and ready for action.
Slightly out gunned
What's that?
In need of some sort of better bump stop.
Sure you can pass there.
I think my proximity, or massive amounts of body roll, made him uncomfortable
Obviously he passed me on the straight. Good times and good driving by the gent in the yellow Corvette.
Practicing his left foot braking skills.
Wednesday, May 16, 2018
Trackday Prep
The car is registered for a trackday this weekend. A few track prep items to complete prior to its debut on Sunday.
Nut and bolt check, motor mounts, suspension, steering, hoses (Saturday)Check front and rear toe (Saturday)Check oil (Saturday)Check transmission fluid (Saturday)Bleed front brakes (Friday)Flush coolant again (Friday)Hardwire hazard switch so signals work (Thursday)Finish seat back brace (Thursday)Roll passenger side rear fender (Thursday)
Friday, May 11, 2018
Thursday, May 10, 2018
Accepted, and rules review
On a postive note the team was accepted and will be participating in the Cure for gingervitis '18.
I took an opportunity to review the rules yet again and highlight what we still need to complete on the car.
- Buy drip pan
- Maybe buy another fuel jug
Finish seat back brace- Safety wire snap on harness ends
Replace coolant- Remove airbag, replace steering wheel
- Get and install numbers
- Buy packing tape and tape lights
- Gather up and organize documentation
- Mount transponder
Set timing- Cool shirt setup
We are damn close and intend to shake down the car at an upcoming track day.
The car is still really soft, thinking we can find in the budget some urethane shock bumps tops to stiffen it up.
The car is still really soft, thinking we can find in the budget some urethane shock bumps tops to stiffen it up.
Sunday, May 6, 2018
The journey continues
With the help of some team members we got some good work don this weekend.
- front bumper stitched back together
- grill mesh in place
- roll cage padding
- rear view mirror in place
- tail pipe fabricated
- brakes bled
- floor grip taped
Still to complete:
- front bumper stitched back together
- grill mesh in place
- roll cage padding
- rear view mirror in place
- tail pipe fabricated
- brakes bled
- floor grip taped
Still to complete:
- Car numbers
- Go over the firewall again
- Transponder
Finish seat back brace- Removable steering wheel solution
Wednesday, May 2, 2018
Weeknight Progress
Tonight I started on a couple things. I replace the exhaust pipe that runs from just under the engine to past the gas tank. I need to fit a tail pipe.
I also started plugging the sunroof.
I also started plugging the sunroof.
About 800 more spot welds to go.
Updated pic of the interior
Subscribe to:
Posts (Atom)